Page Register

System of Fortification Drawing

1

2

3

4

5

6

7

8

9

Problems of the Right Line and Plane

10

11

12

13

14

15

16

Problems of Irregular Surfaces and the Right Line and Plane

17

18

19

20

21

22

23

Application of Preceding Problems

24

25

26

27

28

29

Plan, Section, Elevation, and Profile

30

31

32

33

34

35

36

37

38

39

40

41

Permanent Fortification

Preliminary Considerations

42

Component Elements of Permanent Works

General Profile

43

44

45

46

47

48

Scarp

49

50

Parapet

51

52

53

54

55

56

57

58

Counterscarp Wall

Ditch

59

60

General Remarks

61

Open Defences

Loop-holed Walls

62

63

64

Barbette Batteries

65

Embrasure Batteries

66

Machicoulis

67

68

Covered Defences

Detached Scarp Walls

69

70

Scarp Galleries

71

72

73

Counterscarp Galleries

74

Bastionnets

75

76

77

Caponniere Defences for the Enceinte and Ditch

78

79

80

Casemates on Land Fronts

81

82

Mortar Casemates

83

Casemates for Water Fronts

84

85

86

Embrasures

87

88

89

Bomb-proof Buildings

90

91

Powder Magazine

92

Communications

Ramps

93

Stairs

94

95

Gateway

96

Port-cullis

97

98

Elements of the Plan of Enceintes and Outworks

Enceintes

System of Fortification

99

Circular System

Polygonal System

Tenailled System

Bastioned System

100

Front of Fortification

Outworks and Detached Works

101

Covered-Way

102

Places of Arms

103

Traverses

Tenaille

104

Demi-lune

Counterguard

Redoubts

105

Tenaillon

Horn-work

Crown-work

106

Detached Works

107

Interior Retrenchments

108

109

Bastioned System

110

111

112

END.